00:00:18.939 --> 00:00:25.759
Hello, today we will discuss the very important
part of housing policy and planning which

00:00:25.759 --> 00:00:35.910
is the technology system, which enables developer
or which ultimately deliver housing to the

00:00:35.910 --> 00:00:37.510
user groups.

00:00:37.510 --> 00:00:44.199
So before we come to the technology systems
let us have quick recap of the last discussion.

00:00:44.199 --> 00:00:48.780
In the last discussion we discussed about
the housing finance and affordability.

00:00:48.780 --> 00:00:55.850
In the affordability session we discussed
two elements what is which influence the relative

00:00:55.850 --> 00:00:58.329
affordability of a product.

00:00:58.329 --> 00:01:02.960
One is the supply side, which reduces the
price of the product or cost of the product

00:01:02.960 --> 00:01:08.610
and the demand side intervention, which basically
enhances the capacity of the people to purchase

00:01:08.610 --> 00:01:10.970
a house.

00:01:10.970 --> 00:01:17.060
Then we discuss the housing finance the some
concept of the housing finance how it is operated,

00:01:17.060 --> 00:01:21.170
what is major processes and the major problem
and issues.

00:01:21.170 --> 00:01:27.020
We have seen that major problems was the access
by the common people, poor people to the housing

00:01:27.020 --> 00:01:35.670
finance, it is flexibility and the formal
mechanism, which create some barrier and also

00:01:35.670 --> 00:01:40.660
we have seen that the NPS nonperforming as
it is which is major concern from the major

00:01:40.660 --> 00:01:47.750
bank and based on that discussion, we will
come to the next part of the discussion today,

00:01:47.750 --> 00:01:51.750
which is called as the technology systems.

00:01:51.750 --> 00:01:57.200
In the initial lecture when we discuss the
problems of housing delivery, we identified

00:01:57.200 --> 00:02:02.420
several elements, which is basically barriers
or creating the barriers in effective housing

00:02:02.420 --> 00:02:07.390
delivery and within that we identified two
to three major barriers, one major barrier

00:02:07.390 --> 00:02:12.950
was housing affordability, which we discussed
last day and later on we will come as when

00:02:12.950 --> 00:02:13.950
required.

00:02:13.950 --> 00:02:21.780
Another major barrier was that the project
construction, project delivery of the housing

00:02:21.780 --> 00:02:30.210
because housing such subject, such matter,
which need to be constructed on ground really,

00:02:30.210 --> 00:02:38.180
and deliver to the people and it depends on
many factors land, availability of the material,

00:02:38.180 --> 00:02:43.450
availability of the labour, the technology
system or technology, which is actually creating

00:02:43.450 --> 00:02:50.300
the housing, how it is delivering and the
administrative in the office institutional

00:02:50.300 --> 00:02:53.840
mechanism, which also influences the speed
of the housing.

00:02:53.840 --> 00:03:00.450
So within that we have seen that in the current
practice the one housing, bigger housing project

00:03:00.450 --> 00:03:07.180
like say 500 or 1000 unit, housing project
which takes 4 years or 5 years from the inception

00:03:07.180 --> 00:03:13.180
to the completion or this for other and sometimes
it takes more it is delayed.

00:03:13.180 --> 00:03:19.550
One of the major problem of this delay and
the durational, long duration is the conversational

00:03:19.550 --> 00:03:24.770
technology system and conversational construction
system, which used and this construction system

00:03:24.770 --> 00:03:35.600
by enlarge is onsite.

00:03:35.600 --> 00:03:41.130
And since it is onsite construction that means
starting from the foundation to the super

00:03:41.130 --> 00:03:46.960
structure to the everything finishing, infrastructure
everything is done on site and because of

00:03:46.960 --> 00:03:54.020
the onsite it takes long-time and not only
time the onsite activity of the construction,

00:03:54.020 --> 00:04:10.800
onsite 100% onsite construction it leads to
time delay and since there is time delay it

00:04:10.800 --> 00:04:24.240
leads to cost escalation, another very important
but it is related with that since it is a

00:04:24.240 --> 00:04:32.319
site based construction the quality also compromised.

00:04:32.319 --> 00:04:37.320
Quality of the product, quality of the housing
also compromised because it is onsite construction

00:04:37.320 --> 00:04:42.840
based on the actual availability of the labour
and it is skill level.

00:04:42.840 --> 00:04:52.350
So, these are the issues and also sometimes
it leads to the conflicts between the inducers

00:04:52.350 --> 00:05:01.990
and developer and dissatisfaction.

00:05:01.990 --> 00:05:09.250
As response to this problem one of the solution
is that to construct the onsite activity to

00:05:09.250 --> 00:05:18.710
a outside model where 
offsite model where the major construction

00:05:18.710 --> 00:05:24.340
take place in a factory in terms of building
compounds.

00:05:24.340 --> 00:05:33.090
Every compound of a house, which is manufactured
at the factory under given design prescription

00:05:33.090 --> 00:05:42.120
and then transported to the site and assembled
on the site and the major differences in the

00:05:42.120 --> 00:05:49.610
onsite construction, some of the activities
are not possible during the rainy season and

00:05:49.610 --> 00:05:51.370
it is prom weather.

00:05:51.370 --> 00:05:56.570
You cannot construct a house in a rainy season
or a in very extreme weather, but if it is

00:05:56.570 --> 00:06:02.540
offsite construction then you do the construction
or the manufacturing at the factory and then

00:06:02.540 --> 00:06:09.010
you come to the site and assemble in a given
period, in suitable time in convenient time.

00:06:09.010 --> 00:06:18.590
So in a short you achieve the time and if
you achieve the time, the cost and quality,

00:06:18.590 --> 00:06:24.509
why quality because if it is done at the factory
it is the quality it is standardise product,

00:06:24.509 --> 00:06:28.880
it is done in a standardise and more monitor
process.

00:06:28.880 --> 00:06:36.640
So it is ensure the quality as well and as
result the more satisfaction will be there

00:06:36.640 --> 00:06:38.190
and dissatisfaction will be result.

00:06:38.190 --> 00:06:44.610
Some of the countries they have gone through
this process of the onsite construction to

00:06:44.610 --> 00:06:50.480
the offsite construction to get the benefit
of this trying effectiveness, cost effectiveness,

00:06:50.480 --> 00:06:51.860
quality everything.

00:06:51.860 --> 00:06:55.630
Some of the country they call it as modular
construction, some of the country they call

00:06:55.630 --> 00:06:59.770
it as manufacture construction or some of
the country they call it as a industrialised

00:06:59.770 --> 00:07:03.520
building system or building technology for
the faster housing.

00:07:03.520 --> 00:07:11.090
So the major advantage of this construction
is basically time saving.

00:07:11.090 --> 00:07:16.080
So in a typical modular construction schedule
and this is a site build constructions schedule

00:07:16.080 --> 00:07:21.180
where you have the permit and approvals then
site development, then building construction

00:07:21.180 --> 00:07:22.520
and site restoration.

00:07:22.520 --> 00:07:29.050
So building construction and site restoration
basically takes long-time, which takes basically

00:07:29.050 --> 00:07:32.710
3 to 5 years for India.

00:07:32.710 --> 00:07:40.060
Whereas in a modular construction or offsite
construction you just need little time to

00:07:40.060 --> 00:07:42.039
install and site restoration.

00:07:42.039 --> 00:07:48.900
So this is the time savings for typical offsite
construction, which we are calling at a industrialised

00:07:48.900 --> 00:07:54.120
building system, which is nothing, but incorporate
the industrialized system at the outside of

00:07:54.120 --> 00:07:59.950
the factory then bringing the product or the
compound in the site and assembling for the

00:07:59.950 --> 00:08:03.380
faster delivery of the housing.

00:08:03.380 --> 00:08:08.410
So to understand in a better way how it works
and how what can be done for India let us

00:08:08.410 --> 00:08:12.410
understand how it works technically.

00:08:12.410 --> 00:08:19.460
Now ultimately since the housing is building
and it is three dimensional object this object

00:08:19.460 --> 00:08:22.850
can be analyzed in three ways.

00:08:22.850 --> 00:08:28.319
One could be that we consider each room or
each unit as box, which is called monolithic

00:08:28.319 --> 00:08:35.099
or box system or three dimensional system
another approach could be that to make a enclose

00:08:35.099 --> 00:08:42.630
space to make building we consider each and
every was as the panel, which is called as

00:08:42.630 --> 00:08:49.380
total system and which is basically two dimensional
because if we consider, if we ignore the thickness

00:08:49.380 --> 00:08:53.930
for our convinces of understanding it is basically
two dimensional.

00:08:53.930 --> 00:09:00.280
It is not enclosing a space fully, but multiple
units of panel can encloses space in a better

00:09:00.280 --> 00:09:07.700
way and also the traditional way of constructing
a house like the beam, and the column and

00:09:07.700 --> 00:09:14.180
the beam, which makes a structure and use
of multiple number of columns and beams can

00:09:14.180 --> 00:09:22.370
create an enclose space, which is called frame
system or linear system, which is basically

00:09:22.370 --> 00:09:24.940
kind of linear one dimensional compound.

00:09:24.940 --> 00:09:31.350
So in industrialized system we can use any
of the approach based on our situation.

00:09:31.350 --> 00:09:38.480
Now let us see which of the situation will
be suitable or useful for India case.

00:09:38.480 --> 00:09:45.529
Now based on the system there are two different
characteristics, which basically influence

00:09:45.529 --> 00:09:46.570
of the system.

00:09:46.570 --> 00:09:50.300
Those are called as close system and open
system.

00:09:50.300 --> 00:09:58.560
In a close system the whole design standardization
and construction is done by only one provider

00:09:58.560 --> 00:10:00.150
or one manufacturer.

00:10:00.150 --> 00:10:07.020
So close system the production can be based
on the client design means if plan can provide

00:10:07.020 --> 00:10:15.660
design to manufacture a manufacture can produce
that housing starting from the design to the

00:10:15.660 --> 00:10:23.000
construction and deliver to the client and
it can be based on the per-caster or the producer

00:10:23.000 --> 00:10:29.040
design sometime the developer or producer
or pre-caster they can design a product, they

00:10:29.040 --> 00:10:34.120
can design construct and manufacture and supply
to the market and based on the markets situation

00:10:34.120 --> 00:10:39.920
people can buy directly from the people so
these are close system.

00:10:39.920 --> 00:10:46.649
The characteristics of the close system is
if I as pre-caster or a producer I develop

00:10:46.649 --> 00:10:51.959
module I develop a product in that product
no other company, no other manufacture will

00:10:51.959 --> 00:10:59.459
be able to monitor or to modify the product
to enhance the product so it is close to the

00:10:59.459 --> 00:11:00.680
other agency.

00:11:00.680 --> 00:11:08.560
Whereas in a open system where in a common
standardized platform many companies can participate

00:11:08.560 --> 00:11:12.470
many company can give their product and those
product can be assembled.

00:11:12.470 --> 00:11:20.580
It is like a assemble computer where in a
bases in a common format the compounds from

00:11:20.580 --> 00:11:26.149
various companies are assembled and integrated
to for a particular purpose.

00:11:26.149 --> 00:11:34.570
So in the open system allows basically greater
flexibility and also it allows the pre-caster

00:11:34.570 --> 00:11:40.029
to produce a limited number of elements with
a predetermined range of product.

00:11:40.029 --> 00:11:45.640
Because in open system it involves integration
of multiple number of agency, multiple number

00:11:45.640 --> 00:11:48.870
of manufactures and the producers.

00:11:48.870 --> 00:11:54.970
So many numbers may not be possible, limited
number of options are possible, but yes the

00:11:54.970 --> 00:12:01.520
comfortably is the issue, but the advantage
of the open system is that it offers the flexibility

00:12:01.520 --> 00:12:09.710
and it offers it do not encouraging monopoly,
but here in the close system is dependent

00:12:09.710 --> 00:12:15.920
on either by the producers or by the client
it basically encourages monopoly and it is

00:12:15.920 --> 00:12:21.690
dependent on the very few one or two large
developer, large manufacturer, but in open

00:12:21.690 --> 00:12:28.870
system many manufactures second category,
third category, fourth category, small, medium,

00:12:28.870 --> 00:12:33.120
higher and very large developer or producer
they can participate and they can develop

00:12:33.120 --> 00:12:35.050
housing.

00:12:35.050 --> 00:12:43.420
Now in a industrial system or outside based
system there are several stages, which is

00:12:43.420 --> 00:12:45.420
required for a country like India.

00:12:45.420 --> 00:12:52.660
Like initially, we start from local material
and construction on site and then slowly we

00:12:52.660 --> 00:12:59.430
go to the using industrial material and then
manual process in situ then we conquer the

00:12:59.430 --> 00:13:05.660
manual assembly in industrial material that
means we are going to manual process, but

00:13:05.660 --> 00:13:11.870
we are assembling the industrial material
like right now in the projects the overall

00:13:11.870 --> 00:13:16.820
process since manual and site based, but we
are using some of the industrial material,

00:13:16.820 --> 00:13:27.399
finishing like say still or the fixture like
say plumbing fixtures, flooring element, windows,

00:13:27.399 --> 00:13:31.550
doors those are manufactured in the industry.

00:13:31.550 --> 00:13:37.620
So we are assembling that we are using that,
but in a manual method then after the next

00:13:37.620 --> 00:13:42.399
stage there will be a partial pre-fabrication,
partial means some of the compounds like wall,

00:13:42.399 --> 00:13:49.580
or the columns or the beams or slap compounds
will be pre-fabricated and after that some

00:13:49.580 --> 00:13:54.700
of the part will be onsite may be fixture
and finishing will be done at the onsite.

00:13:54.700 --> 00:14:00.339
So this is called partial, so right now we
are in this position in India, which is basically

00:14:00.339 --> 00:14:06.900
is combination of the manual labour, manual
and onsite construction and also some amount

00:14:06.900 --> 00:14:09.600
of partial people pre-fabrication we are using.

00:14:09.600 --> 00:14:17.331
We will show the example next day, so the
next stage the close building concept or code

00:14:17.331 --> 00:14:22.600
system with compounds may be one or two or
few developers can or procedure they can come

00:14:22.600 --> 00:14:29.560
forward and they can develop the whole package
of the housing in industrialized mode that

00:14:29.560 --> 00:14:34.351
mean the whole houses will be developed constructed
manufactured in the factory and will supply

00:14:34.351 --> 00:14:41.519
to the site on the given time and may be assembled
and that is possible in the desired quality

00:14:41.519 --> 00:14:44.560
if it is done in a close building system.

00:14:44.560 --> 00:14:49.579
Now the close building system needs integration
with the computer, either drafting and design

00:14:49.579 --> 00:14:54.830
and this will lead to a greater flexibility
of the compound, which is integrated in a

00:14:54.830 --> 00:15:02.339
given flat form, given formatting of the dimensions
so after that producer the open system with

00:15:02.339 --> 00:15:08.700
many suppliers with application of the CAD
and open system from various network on companies

00:15:08.700 --> 00:15:13.560
can achieve, but these are the future stages
with some of the countries they have achieved

00:15:13.560 --> 00:15:14.620
this stages.

00:15:14.620 --> 00:15:22.370
In this stages they have achieved like many
suppliers, many pre-casters their working

00:15:22.370 --> 00:15:27.480
in the market and various options, various
type of housing, typologies their available

00:15:27.480 --> 00:15:32.630
in the market and which does not need more
than two to three months to execute in the

00:15:32.630 --> 00:15:38.750
site and it is cheaper, it is affordable,
it is very quickly constructed options of

00:15:38.750 --> 00:15:46.779
the housing typology, but what you need to
have this industrialized building system.

00:15:46.779 --> 00:15:54.480
There are various pre-request like some of
the pre-request on site, some of the conditions

00:15:54.480 --> 00:15:58.779
required which is outside, which is required
beyond the boundary and some of the pre-request

00:15:58.779 --> 00:15:59.779
the policy.

00:15:59.779 --> 00:16:06.200
I start with the policy parameter like two
enable this kind of construction, we need

00:16:06.200 --> 00:16:12.330
availability of the bigger land sometimes
we are talking about the basically the large

00:16:12.330 --> 00:16:17.930
housing, mass housing and for mass housing,
bigger lands is required so if we change technology

00:16:17.930 --> 00:16:23.320
from the conversational technology to the
new technology, the land is the very important

00:16:23.320 --> 00:16:24.460
input.

00:16:24.460 --> 00:16:26.220
Then the private investment possibility.

00:16:26.220 --> 00:16:32.550
There are very few developers who will be
very much interested to invest the pre-fabricated

00:16:32.550 --> 00:16:34.310
or the industrialized technology.

00:16:34.310 --> 00:16:40.130
So private investment is required and for
that we need a policy parameter by the government

00:16:40.130 --> 00:16:44.720
right now the present government they are
encouraging the industrialized building system

00:16:44.720 --> 00:16:47.060
and pre-fabricated system will largely.

00:16:47.060 --> 00:16:50.870
There are various developers who are coming
forward to invest in this sector.

00:16:50.870 --> 00:16:57.540
I will give the example later on and whenever
there is change of technology, there is need

00:16:57.540 --> 00:17:02.649
for the quality control, so for this quality
control we need building code and the inspection

00:17:02.649 --> 00:17:04.939
mechanism to ensure the quality.

00:17:04.939 --> 00:17:10.709
So new set of building roles, building codes,
new set of control mechanism is required to

00:17:10.709 --> 00:17:16.839
be developed and not only that to execute
this in the ground level we need training

00:17:16.839 --> 00:17:21.531
and capacity building for the people who will
be working in the factory, who will be work

00:17:21.531 --> 00:17:26.579
in the site, who will be working in the authorities
to sanction the building plans so every level

00:17:26.579 --> 00:17:30.849
there will be training and capacity building
because there is a change of whole delivery

00:17:30.849 --> 00:17:32.330
system of the housing.

00:17:32.330 --> 00:17:37.179
Then the employment and labour related reforms
not only the training and capacity building

00:17:37.179 --> 00:17:43.690
some reforms required in the level loss that
is the part of the policy frame work done

00:17:43.690 --> 00:17:45.340
by the government of India.

00:17:45.340 --> 00:17:51.860
So apart from the micro level changes in the
policy we need some amount of reforms or change

00:17:51.860 --> 00:17:57.049
at the outside parameters like if we want
to construct the building compounds in factory

00:17:57.049 --> 00:18:04.220
and want to transport them in a area we another
area which distant we need a better transport

00:18:04.220 --> 00:18:11.389
trade work very robust kind of very strong
kind of transport network consist in the offsite

00:18:11.389 --> 00:18:13.700
road and wider the road, strong road.

00:18:13.700 --> 00:18:19.899
The better payment design so that large size
vehicle can carry all those building material

00:18:19.899 --> 00:18:21.559
to the one place to another place.

00:18:21.559 --> 00:18:29.650
Another very important point I would you like
discuss is that even after the any natural

00:18:29.650 --> 00:18:33.600
these are studies happen.

00:18:33.600 --> 00:18:40.009
We need large infrastructure, road infra structure
to carry the transits houses from one place

00:18:40.009 --> 00:18:49.929
to another place to elect and do an assemble,
and the road infra structure is not sufficient

00:18:49.929 --> 00:19:00.230
we need the intellectual process of the manufacturing
for that the eco system of the individualized

00:19:00.230 --> 00:19:06.379
system of the manufacturing along with labor
input, material input the institutional input

00:19:06.379 --> 00:19:07.379
is required.

00:19:07.379 --> 00:19:11.799
All are input is required and it is possible
with policy framework of the Government as

00:19:11.799 --> 00:19:18.710
well as with help of the private investigator
and then we come to the onsite requirement.

00:19:18.710 --> 00:19:24.399
The suitability for the election and the assembly
place like in hill legion like in Uttarakhand

00:19:24.399 --> 00:19:30.970
and place like in plain legion of slice a
MP or UP may be different geographically and

00:19:30.970 --> 00:19:32.270
topographically.

00:19:32.270 --> 00:19:38.499
So the type of housing typology or the technology
but the particular typology or technology

00:19:38.499 --> 00:19:42.590
may not suitable in plain land which suitable
in hilly land.

00:19:42.590 --> 00:19:49.070
So, based on the type of the plot and the
type of the contest the section of the technologies

00:19:49.070 --> 00:19:52.499
very crucial which is depended on site.

00:19:52.499 --> 00:19:56.929
Second is the applicability and flexibility
for the housing in India contest.

00:19:56.929 --> 00:20:03.549
In India the major housing construction is
incremental because incremental housing is

00:20:03.549 --> 00:20:10.289
more popular because of the nature of the
family structure the social structure how

00:20:10.289 --> 00:20:13.809
people grow economically over the period of
time.

00:20:13.809 --> 00:20:19.440
So if it is possible with in the construction
system that there is some scope of incremental

00:20:19.440 --> 00:20:24.639
construction some amount of scope to make
further addition in the house that kind of

00:20:24.639 --> 00:20:30.139
flexibility required in the new technology
system also.

00:20:30.139 --> 00:20:35.350
Then quality and characteristic of the structure
quality should be durable against all the

00:20:35.350 --> 00:20:43.389
weather effect the hot session, winter session
an also rainy session it should be able to

00:20:43.389 --> 00:20:48.769
its stand all the weather effective including
the natural diastral life flood and cyclone

00:20:48.769 --> 00:20:56.609
on the seismic effects so it should durable
considerating all the major effects.

00:20:56.609 --> 00:21:02.029
And also space standards and the dimensional
and modular coordination and the developed

00:21:02.029 --> 00:21:09.029
module will be contextual for the particular
city or particular zone or particular target

00:21:09.029 --> 00:21:10.029
group.

00:21:10.029 --> 00:21:17.970
So it is basically the area specific geographically
on site specific requirement like the specific

00:21:17.970 --> 00:21:23.840
disbanded for example, the dimension of the
room or dimension of the any module for any

00:21:23.840 --> 00:21:27.769
area in plain land may not be equal with other
land.

00:21:27.769 --> 00:21:33.559
The dimension of a house in a tribal land
may not be equal of a dimension of a house

00:21:33.559 --> 00:21:36.309
which is than at the city code area.

00:21:36.309 --> 00:21:40.999
So depending on the contest depending on the
target group depending on the geographical

00:21:40.999 --> 00:21:49.080
location we may have to very this space standards
the coordination between the space standards

00:21:49.080 --> 00:21:51.879
and it is the module.

00:21:51.879 --> 00:21:58.269
So in hard the onsite to offsite and policy
parameter are very much require to bring or

00:21:58.269 --> 00:22:04.190
to change technology from one system to another
system.

00:22:04.190 --> 00:22:11.409
So the progress in India till the last decade
there has been lot of experimentation of the

00:22:11.409 --> 00:22:17.820
products like say building products in the
flooding in the walling and roofing element,

00:22:17.820 --> 00:22:24.500
but in spite all these experiment and attempts
we could not achieve the total technology

00:22:24.500 --> 00:22:29.600
transport total technology change in the India
in the mass housing sector.

00:22:29.600 --> 00:22:37.479
It was limited to the laboratory experiment
which some pilot experiment and pilot demonstration

00:22:37.479 --> 00:22:42.100
project, but right now there is a big stars
by the Government of India after the national

00:22:42.100 --> 00:22:48.970
housing and habitat policy and read the current
pradhan mantri awas yojana there is a sub

00:22:48.970 --> 00:22:53.019
mission which is called to technology submission
under the technology submission Government

00:22:53.019 --> 00:22:58.669
of identified many technologies which will
transfer the technologies from on site to

00:22:58.669 --> 00:22:59.879
offsite.

00:22:59.879 --> 00:23:05.679
And this technologies these are indentified
technology like using monolithic construction

00:23:05.679 --> 00:23:12.399
technology, monolithic concrete construction
expanded polystyrene panel system, 3-S system,

00:23:12.399 --> 00:23:19.509
precast for system GFRG panel system then
modular building system and Light Gauge Steel

00:23:19.509 --> 00:23:21.749
Frame Structure.

00:23:21.749 --> 00:23:26.280
Next day when we will show some of the case
studies in Indian situation where will see

00:23:26.280 --> 00:23:32.909
that the large scale construction mass housing
construction is possible using some of the

00:23:32.909 --> 00:23:38.899
technologies like that, but most of the technologies
are under develop in most of the research

00:23:38.899 --> 00:23:43.979
laboratories including ITS and this central
research laboratories so upper some time may

00:23:43.979 --> 00:23:49.279
be upper five years or ten years this technologies
will be able to deliver housing in a faster

00:23:49.279 --> 00:23:55.000
way in a speeder way and as a result of that
it will reduce the cost of the building in

00:23:55.000 --> 00:23:56.509
a great extend.

00:23:56.509 --> 00:24:06.049
So with these two days discussion today we
discussed the technology system which is basically

00:24:06.049 --> 00:24:13.409
are supply side intervention because two change
technology from onside to offside technology

00:24:13.409 --> 00:24:20.049
can reduced the cost of the housing project
substantially because if change from onside

00:24:20.049 --> 00:24:25.279
to offside we get the advantage on the time,
advantage of the cost, advantage of the quality

00:24:25.279 --> 00:24:33.440
and advantage of the user satisfaction, but
it needs several prerequisite one side prerequisite

00:24:33.440 --> 00:24:38.729
off side prerequisite policy prerequisite
and as a system it has three different kind

00:24:38.729 --> 00:24:43.690
of system one is a box system, panel system
and linear system.

00:24:43.690 --> 00:24:50.349
It has two different corrected sties one is
a open system and other is a close system.

00:24:50.349 --> 00:24:55.360
Close system is depending on the provider
supplier who is basically developing whole

00:24:55.360 --> 00:25:02.440
package, whole housing as pro package where
other provides other supplies not allowed

00:25:02.440 --> 00:25:09.419
or permitted to intervened where as in open
system many suppliers and many providers,

00:25:09.419 --> 00:25:16.969
many producers they are work in a common plat
form like assemble computer and cross system

00:25:16.969 --> 00:25:27.239
is a open system follow is the close system
in India right now we are going to a combination

00:25:27.239 --> 00:25:31.919
of a onside and off side construction using
manual labor mostly.

00:25:31.919 --> 00:25:37.070
But next stage provably with the close system
and with the Government policy we can have

00:25:37.070 --> 00:25:42.219
better system to deliver housing using the
new technologies in India after the pradhan

00:25:42.219 --> 00:25:44.799
mantri awas yojana and technologies submission.

00:25:44.799 --> 00:25:51.389
We have shown that videos technologies are
identified next day will show you some of

00:25:51.389 --> 00:25:57.299
the guess study some of the examples how to
the technology can be used to reduce the time

00:25:57.299 --> 00:26:00.450
and cost and what are the future prospect
in regards, so thank you.