Hello last day we discussed about few infrastructures
required for housing development today we

00:00:27.130 --> 00:00:33.140
will discuss social infrastructure part or
the community facilities which is also required

00:00:33.140 --> 00:00:37.879
for the housing development so our objective
or the focus in toady’s discussion will

00:00:37.879 --> 00:00:40.550
be social infrastructure facilities.

00:00:40.550 --> 00:00:49.089
So before that let us have quick recap we
discussed about the roads sewage sanitation

00:00:49.089 --> 00:00:55.909
drainage waste management and power supply
briefly just to have an over view from the

00:00:55.909 --> 00:01:01.710
loads we discussed that there are 4 categories
of road arterial road sub arterial road collector

00:01:01.710 --> 00:01:09.020
road and local roads this roads makes a skeleton
and the structure of the CT or a residential

00:01:09.020 --> 00:01:16.110
development then we discuss the drainage the
in the drainage as planning basic important

00:01:16.110 --> 00:01:17.700
is the out fall of the drainage.

00:01:17.700 --> 00:01:23.130
And the network drainage network is done is
along the road similarly for the electricity

00:01:23.130 --> 00:01:28.350
the basic electricity network is done alone
the road it could be below the road or it

00:01:28.350 --> 00:01:35.749
could be over the road and a part from the
network that could be there are the substations

00:01:35.749 --> 00:01:41.409
for that substantial then need to are marked
I will show the example that how it works

00:01:41.409 --> 00:01:48.659
in NFCT and a part and also the sewerage and
sanitation we need to treat our human excrete

00:01:48.659 --> 00:01:54.899
and the waste for that there could be natural
process we took an example that is Kolkata

00:01:54.899 --> 00:01:57.740
wet lands and the west cycling region.

00:01:57.740 --> 00:02:03.070
There could be mechanized or the scientific
process using sewerage treatment plane and

00:02:03.070 --> 00:02:09.700
also there could be individualized personalized
approach like septic tanks and respective

00:02:09.700 --> 00:02:14.260
apart from that we after that we after that
we discuss the spoiled waste management or

00:02:14.260 --> 00:02:21.150
the waste management in the waste management
there are few more concept like say the collection

00:02:21.150 --> 00:02:22.150
collections are done at 3 levels.

00:02:22.150 --> 00:02:27.610
The primary level and the house hold level
the secondary level at the your locality or

00:02:27.610 --> 00:02:32.750
the never you enter shade level at the bigger
scale and the city level after that we go

00:02:32.750 --> 00:02:38.740
for disposer and the treatment the main objective
this waste management is to segregate the

00:02:38.740 --> 00:02:44.650
waste at the force and complete the whole
process of the waste management into the disposal

00:02:44.650 --> 00:02:50.810
and the recycle of the waste that we can recover
the investment in the waste management and

00:02:50.810 --> 00:02:57.560
after that we concluded that the all the infrastructure
are required and it takes substantial amount

00:02:57.560 --> 00:02:59.920
of space and investment both.

00:02:59.920 --> 00:03:08.070
For example for nay town shape or residential
development the space required for the transportation

00:03:08.070 --> 00:03:16.030
water supply sewerage sanitation and waste
management takes almost 10 to 15 % of the

00:03:16.030 --> 00:03:22.860
overall area so it is very important how we
can meticulously plane a town ship or residential

00:03:22.860 --> 00:03:27.090
development incorporating all the physical
infrastructure but apart from the physical

00:03:27.090 --> 00:03:32.480
infrastructure there are facilities commutative
facilities which is required as a essential

00:03:32.480 --> 00:03:33.900
part of the housing development.

00:03:33.900 --> 00:03:38.260
So this commutative faculties are sometimes
called as a special infrastructure sometimes

00:03:38.260 --> 00:03:44.760
we can call it commutative but those also
need substantial land space and the substantial

00:03:44.760 --> 00:03:53.200
investment to make it livable to make it more
better quantity for the housing development

00:03:53.200 --> 00:03:58.630
so we discuss the objective of the infrastructure
is to creating basic infrastructure providing

00:03:58.630 --> 00:03:59.960
facilities and amentias

00:03:59.960 --> 00:04:01.620
And delivering accountable services.

00:04:01.620 --> 00:04:06.130
(Refer Slide Time: 04:03)
These are the basic terms we mentioned we

00:04:06.130 --> 00:04:11.380
are not going into much details to the.

00:04:11.380 --> 00:04:17.250
We mentioned that infrastructure and services
are plane at various level starting from the

00:04:17.250 --> 00:04:19.780
city level to the local level.

00:04:19.780 --> 00:04:26.639
These are the norms we mentioned URDPFI Guidelines
and NBC national building code electrical

00:04:26.639 --> 00:04:34.460
code CPHEEO manual which basically manual
for the public health manual dealing with

00:04:34.460 --> 00:04:39.780
sewerage sanitation and diverse management
and a part from there could be local rules

00:04:39.780 --> 00:04:45.760
and regulation frame by the municipal authorities
and development authorities time to time.

00:04:45.760 --> 00:04:50.590
So after that let us see some of the norms.

00:04:50.590 --> 00:04:55.040
Of the social infrastructure so when we say
the social infrastructure there are education

00:04:55.040 --> 00:05:02.460
infrastructure staring from the very elementary
school to the technical college or the university

00:05:02.460 --> 00:05:08.780
and the college system and the health system
starting from the neighborhood clinic to the

00:05:08.780 --> 00:05:15.000
district hospital or the sub district hospital
level and also they are commutative facilities

00:05:15.000 --> 00:05:20.570
so we are going to show you that some of the
norms for the social infrastructure which

00:05:20.570 --> 00:05:30.520
is given at the URDPFI godliness government
of India so basically these norms are provided

00:05:30.520 --> 00:05:31.520
at various level.

00:05:31.520 --> 00:05:36.240
I told you that pre primary nursery school
is provide for the population of only 2500

00:05:36.240 --> 00:05:38.160
where as the a primary school is provided
for the population of only 2500 where as a

00:05:38.160 --> 00:05:45.680
primary school is provide for 5000 and population
and a secondary school is provided for a 7500

00:05:45.680 --> 00:05:53.150
which is little beyond then your locality
and it is little beyond the neighborhood and

00:05:53.150 --> 00:05:58.630
you can see the area requirement for the pre
primary to the secondary school is very different

00:05:58.630 --> 00:06:01.650
this is from small to bigger.

00:06:01.650 --> 00:06:06.639
And there are other requirements like playfield
the amount of playfield required for every

00:06:06.639 --> 00:06:14.040
level of school so this the provision for
the school as per the population standard

00:06:14.040 --> 00:06:19.360
is concern as per the area is concern and
as per the physical the requirement of the

00:06:19.360 --> 00:06:26.740
playfield and other requirements are concerned
similarly for the school or the education

00:06:26.740 --> 00:06:31.040
facility at the higher level like indicated
school without the hostel facility integrated

00:06:31.040 --> 00:06:37.690
school with hostel facility school for physically
challenged school for manually mentally challenged.

00:06:37.690 --> 00:06:43.370
So the student strength the populations served
and the areas are given so if you see the

00:06:43.370 --> 00:06:47.640
areas there will be there categories of areas
one is the school building area which is given

00:06:47.640 --> 00:06:54.190
playfield area and the parking area so this
is indicative area requirement based on actual

00:06:54.190 --> 00:07:00.300
area availability at the side probably you
can work out your exact design and planning

00:07:00.300 --> 00:07:07.150
of the physical of the social infrastructure
and these are the controls required for this

00:07:07.150 --> 00:07:13.150
school or college development now see the
requirement for the college you can see the

00:07:13.150 --> 00:07:18.840
population served for each college is 1.2
lakh that mean the college is affordable one

00:07:18.840 --> 00:07:23.120
college cannot be affordable for locality
or the neighborhood area or the cluster area

00:07:23.120 --> 00:07:29.500
it can be given at the city level city means
one more than lakh similarly university campus

00:07:29.500 --> 00:07:34.210
is for bigger facility so for the college
you do not to only need the college building

00:07:34.210 --> 00:07:41.050
area or field area or parking area you also
need the residential area including hostel

00:07:41.050 --> 00:07:47.800
building area similarly for the university
campus you need lot of areas residential areas

00:07:47.800 --> 00:07:52.190
sport facility parks landscaping area parking
etc.

00:07:52.190 --> 00:07:57.419
You can see the technical notification which
is required at the higher level for 10 lakh

00:07:57.419 --> 00:08:02.520
population which can be a pile technique or
can be centrally funded technical application

00:08:02.520 --> 00:08:07.390
so these are the requirements for the technical
education now based on your area if area is

00:08:07.390 --> 00:08:13.880
small to medium to large you can provide the
social infrastructure as per the requirement

00:08:13.880 --> 00:08:19.850
similarly the engineering college medical
college professional college nursing parameter

00:08:19.850 --> 00:08:24.530
institute veterinary institute all the institutes
have their own respective provisions and the

00:08:24.530 --> 00:08:28.220
population standards which you can follow
during the plane during your planning

00:08:28.220 --> 00:08:33.570
So you can understand that for providing this
kind of facility at various levels from city

00:08:33.570 --> 00:08:41.019
level to the local level you need substantial
area reserved or located along the your residential

00:08:41.019 --> 00:08:45.500
area or across the residential area so that
you can achieve the better quality of the

00:08:45.500 --> 00:08:51.640
beatify and better benefit to the people now
we come to the health care you can see the

00:08:51.640 --> 00:08:54.850
health care services given.

00:08:54.850 --> 00:09:02.180
From the lowest health care facility like
a dispensary which is given minimum for 1500

00:09:02.180 --> 00:09:09.680
population but definitely in housing area
or in a locality small clinics or small doctors

00:09:09.680 --> 00:09:16.180
chamber could be there in isolated building
or stand on building it is permitted as for

00:09:16.180 --> 00:09:20.020
the lone and it can part of like mix land
use.

00:09:20.020 --> 00:09:24.640
So it cam part form the dispensary and the
nursing home it can serve the local people

00:09:24.640 --> 00:09:32.640
in a better waste and then the nursing home
or the child care center or the maternity

00:09:32.640 --> 00:09:37.420
center which is 4500 to 1 lakh you can see
the area requirement so dispensary nursing

00:09:37.420 --> 00:09:43.140
home policlinic intermediate hospital different
category multi specialty hospital which is

00:09:43.140 --> 00:09:48.140
required at the CT level that is 1 lakh population
you can see that for all this kind of facility

00:09:48.140 --> 00:09:53.370
you need hospital area as well as you need
the residential accommodation so that the

00:09:53.370 --> 00:09:58.990
people over there they can stay there I mean
as they can provide the facility to in patient

00:09:58.990 --> 00:10:01.010
facility to the people.

00:10:01.010 --> 00:10:07.090
So specialty hospital it can come 1 lakh or
more general hospital 2.5 lakh usually the

00:10:07.090 --> 00:10:13.770
general hospital comes for a CT mid size ct2
to 5 like population family well fare center

00:10:13.770 --> 00:10:19.510
can come 5000 0 population diagnostic center
apart from all these facility say for a diagnostic

00:10:19.510 --> 00:10:27.240
face center could be there private or the
public authority can develop such center then

00:10:27.240 --> 00:10:31.290
veterinary hospital for bets and animal disciplinary
center.

00:10:31.290 --> 00:10:36.270
These are different kinds of health facility
required for different housing development

00:10:36.270 --> 00:10:43.120
or town ship development now let us go for
the cultural part apart from the educational

00:10:43.120 --> 00:10:50.670
and the health facility we need specific cultural
element in the overall planning and development

00:10:50.670 --> 00:10:57.840
like hosing area community room community
hall Barth hall or library kind of facility.

00:10:57.840 --> 00:11:03.120
Music, dance and drama center meditation comes
spiritual center, recreational club, old age

00:11:03.120 --> 00:11:09.741
home over the period of time old age home
though we write at the as a part of social

00:11:09.741 --> 00:11:16.060
and cultural facility but old age home has
become a very important solving typology in

00:11:16.060 --> 00:11:20.470
the later part of our this lecture series
we will discuss with old age home in a greater

00:11:20.470 --> 00:11:21.470
details.

00:11:21.470 --> 00:11:26.500
But let us take a note that earlier we used
to treat this as a cultural facility but now

00:11:26.500 --> 00:11:32.839
we treat this a very important housing typology
because over that we would have time this

00:11:32.839 --> 00:11:37.830
typology is going to be increase and there
are more requirement of the old age home then

00:11:37.830 --> 00:11:44.450
the religious facility at various level also
can be there and this is the population for

00:11:44.450 --> 00:11:50.959
this is the area so this areas are indicated
but based on these and the actual area.

00:11:50.959 --> 00:12:02.590
Have a level in your area you can basically
metalize plan your land basically so apart

00:12:02.590 --> 00:12:07.649
from the commutative center and the cultural
facility there could be facilities like say

00:12:07.649 --> 00:12:13.370
children center the centre for physically
and mentally handicapped, working women or

00:12:13.370 --> 00:12:19.990
men hostel, adult education center, night
shelter then exhibition come fare ground sign

00:12:19.990 --> 00:12:26.560
center, international convention, now please
take a look at the working humans hostel at

00:12:26.560 --> 00:12:27.610
the night shelter.

00:12:27.610 --> 00:12:34.510
Though it is shown as a part of facilities
it is also like in old age home we told that

00:12:34.510 --> 00:12:40.529
it is a very important housing typology because
now it is the amount of the working human

00:12:40.529 --> 00:12:45.190
and men hostel are going to be increase in
your future because more and more the number

00:12:45.190 --> 00:12:50.089
of people are coming from one city to another
city one city to the village area there going

00:12:50.089 --> 00:12:54.300
their either by single or which is small family.

00:12:54.300 --> 00:12:59.130
So for this kind of purpose the working humans
and men hostel is very important for in a

00:12:59.130 --> 00:13:03.910
housing development similarly for night shelter
the people who are staying there in the roads

00:13:03.910 --> 00:13:09.370
verse payment willets they need night shelter
for their they cannot afford they food how

00:13:09.370 --> 00:13:14.510
is that cannot afford an hostel even so night
shelter are given as a social facility as

00:13:14.510 --> 00:13:22.740
a social benefit to the people by the government.

00:13:22.740 --> 00:13:29.140
So apart from these we provide the open recreational
green areas in every level like in housing

00:13:29.140 --> 00:13:37.580
cluster three to four local parts and play
ground you can see the size of the local parts

00:13:37.580 --> 00:13:44.269
and it will serve the 500 population at the
cluster level at the never the level it will

00:13:44.269 --> 00:13:50.060
solve the 15000 population and the area will
be one hector at the community level sometimes

00:13:50.060 --> 00:13:52.680
we call it as a sector or block the name can
be different.

00:13:52.680 --> 00:13:59.910
But the concepts should be clear at the community
level the community level part should be serving

00:13:59.910 --> 00:14:06.230
about 1 lakhs or it can be little less than
that also based on the your planning of the

00:14:06.230 --> 00:14:12.019
city and it will be having 5 hector of area
similarly we have district our zone of or

00:14:12.019 --> 00:14:18.101
the sub city level or sub city level parks
which is much bigger than the lower level

00:14:18.101 --> 00:14:20.839
you can see 25 hector and 100 hector.

00:14:20.839 --> 00:14:27.980
So in a city or in a housing area the overall
area required for the green areas is ranging

00:14:27.980 --> 00:14:33.360
from 10 to 15 percent so it is not very less
amount of area so out of 1005 of the total

00:14:33.360 --> 00:14:40.060
area 50 to 60% areas go to net plot of the
residential use network for the housing another

00:14:40.060 --> 00:14:47.310
10 to 15% goes to the traffic and transportation
another 10 to 15% goes to open decoration

00:14:47.310 --> 00:14:53.360
area and left areas are meant for the other
community facilities including health, education

00:14:53.360 --> 00:14:58.980
and community facilities including commercial
areas.

00:14:58.980 --> 00:15:03.610
Now let us see the how the facilities come
at the different level so this is an overall

00:15:03.610 --> 00:15:10.860
level, cluster level, block community or sector
level whatever you do I mean we say and this

00:15:10.860 --> 00:15:20.180
is the unit level at the room so at the room
this is the least level of unit least level

00:15:20.180 --> 00:15:27.149
of facility unit means the housing unit block
is the combination of the several units, cluster

00:15:27.149 --> 00:15:31.620
is consisting of several blocks and several
one neighborhood is consisting of several

00:15:31.620 --> 00:15:32.620
cluster.

00:15:32.620 --> 00:15:37.529
So we can see that most of the facility are
given at the neighborhood level or the cluster

00:15:37.529 --> 00:15:42.690
level but few facility are there like say
in garbage disposal which is coming at the

00:15:42.690 --> 00:15:48.420
block level or even sometimes unit level,
intercom facility heating and cooling facility,

00:15:48.420 --> 00:15:53.709
Wi-Fi facility, swimming pool, parking all
are particular and parcel of the individual

00:15:53.709 --> 00:15:59.279
room or the block level facility, similarly
after the neighborhood level we can go to

00:15:59.279 --> 00:16:02.970
the sector level or block level or the community
level or the city level.

00:16:02.970 --> 00:16:10.310
Where the bigger size or the bigger level
of facilities will come so we see the picture

00:16:10.310 --> 00:16:18.450
again we last lecture also we took this example
the typical layout of a neighborhood cluster.

00:16:18.450 --> 00:16:24.190
So here we can see that four neighborhoods
are there the plot layout plan 1, 2, 3, 4

00:16:24.190 --> 00:16:28.440
and the blue colors you can see these are
the educational facility these are the higher

00:16:28.440 --> 00:16:34.779
secondary school and these are the primary
school within the neighborhood and this small

00:16:34.779 --> 00:16:45.880
blue areas these are the elementary school
similarly the red colors shows the commercial

00:16:45.880 --> 00:16:50.420
facility at the sector level or at the neighborhood
level.

00:16:50.420 --> 00:16:56.620
The convention shorts will be there and similarly
the green and the blue shows the open areas

00:16:56.620 --> 00:17:03.980
at different level this are the centralized
open area at the sector level whereas the

00:17:03.980 --> 00:17:10.169
this green areas are servicing the neighborhood
and the cluster for example this green areas

00:17:10.169 --> 00:17:15.970
are servicing this cluster so that people
from this side and that side can come and

00:17:15.970 --> 00:17:22.329
enjoy whereas this green areas and the water
body can be enjoyed for all the people living

00:17:22.329 --> 00:17:23.589
in this neighborhood.

00:17:23.589 --> 00:17:29.470
So this is an example by which you can understand
that how the differential facility are placed

00:17:29.470 --> 00:17:35.730
and how the local roads are connected with
the residential area, now last to last discussion

00:17:35.730 --> 00:17:42.600
they develop an control you can see that here
we have used two colors two set of colors

00:17:42.600 --> 00:17:49.660
for residential area one dark yellow and one
lighter yellow, so this two colors show the

00:17:49.660 --> 00:17:56.660
different height to correct height of the
building by enlarge the concept is that if

00:17:56.660 --> 00:18:00.410
this is an neighborhood.

00:18:00.410 --> 00:18:11.100
Then your peripheral building could be higher
high rise and your internal building could

00:18:11.100 --> 00:18:28.680
be little low rise and this could be road
and the internal phase could be used as a

00:18:28.680 --> 00:18:43.140
green area, so this is done to ensure the
adequate light ventilation and visual continuity

00:18:43.140 --> 00:18:52.320
so that so please connect with our discussion
related to the building controls and the urban

00:18:52.320 --> 00:18:58.080
design so based on that two different types
of building typologies or the building envelop

00:18:58.080 --> 00:19:02.169
or considered and placed at the pheri- pheri
and the centre of any neighborhood.

00:19:02.169 --> 00:19:07.630
It could be different also it is just an example
to understand you people that how it works

00:19:07.630 --> 00:19:08.630
not only that.

00:19:08.630 --> 00:19:13.380
In the internal layout of the neighborhood
you can see that local roads are there local

00:19:13.380 --> 00:19:18.610
roads can be connected with other local road
and also local road can be open ended like

00:19:18.610 --> 00:19:23.520
that close ended which we call it as call
attacks which will service only the internal

00:19:23.520 --> 00:19:30.950
prods only so how this local roads the community
facilities this phase for the community facilities

00:19:30.950 --> 00:19:36.480
green areas acts together that is very important
thing to see.

00:19:36.480 --> 00:19:41.570
One another very important part to be observed
that major atria growth and the artery growth

00:19:41.570 --> 00:19:46.840
and the same artery road are also connected
with a local road and the connector road but

00:19:46.840 --> 00:19:51.530
this will not open up in the men garage way
this will open up only in the service road,

00:19:51.530 --> 00:19:58.080
please recall our discussion in the last two
lectures when we displayed the typical section

00:19:58.080 --> 00:20:01.840
of a road arterial road several road and the
local road.

00:20:01.840 --> 00:20:07.890
So this connection of the local road and the
arterial road not directly there so this is

00:20:07.890 --> 00:20:12.540
not an intersection this is not an intersection
this is only matching with the meeting with

00:20:12.540 --> 00:20:19.760
the surface rod so that is how we physically
we try to figure out the any housing area

00:20:19.760 --> 00:20:25.760
metric closely plot by plot personal so that
after this exercise we can take a percent

00:20:25.760 --> 00:20:29.790
of land and this person of land we can give
it to develop our.

00:20:29.790 --> 00:20:34.450
And tell them okay develop a housing project
of this march of unit and this is the density

00:20:34.450 --> 00:20:41.640
prescribed this is ATL prescribe so without
this exercise without the lens sub division

00:20:41.640 --> 00:20:46.470
without the allocation of the physical socio
infrastructure and the network we cannot go

00:20:46.470 --> 00:20:52.710
to the next level of the process housing development
so from the lands plan or the planning of

00:20:52.710 --> 00:20:56.169
a city to the housing develop and at the project.

00:20:56.169 --> 00:21:00.860
These are the necessary steps.

00:21:00.860 --> 00:21:07.400
Similarly this is another example you can
see there also these are the areas for the

00:21:07.400 --> 00:21:12.080
schools or the health facilities this is the
commercial facilities and this the commercial

00:21:12.080 --> 00:21:14.900
facilities and this is the green space for
green spaces are consider to be a continuous

00:21:14.900 --> 00:21:20.240
space as a example and these are the network
of the local roads.

00:21:20.240 --> 00:21:27.700
So to plan for the social amenities and facilities
basic challenges are that how to maintain

00:21:27.700 --> 00:21:36.650
the basic norms and standards the space standards
given by the URD Wi-Fi guide lines is indicative

00:21:36.650 --> 00:21:42.570
but if you want to follow the all the space
standards sometimes you might end up in space

00:21:42.570 --> 00:21:48.840
crunch you will find that so much space of
the land space is not available in your oral

00:21:48.840 --> 00:21:53.860
area or may be that you do not need so much
of area so how to make it balance without

00:21:53.860 --> 00:21:58.844
creating any dis-balance or distribution of
the various kinds of social facility how you

00:21:58.844 --> 00:22:00.210
can achieve a balance and you can provide
all categories of socialfacility how we can

00:22:00.210 --> 00:22:06.830
achieve a balance and you can provide all
categories of social facilities that is the

00:22:06.830 --> 00:22:07.919
basic.

00:22:07.919 --> 00:22:12.530
Challenge to how you can how much you can
maintain the norms the limit the prescribe

00:22:12.530 --> 00:22:15.250
norm from the facility.

00:22:15.250 --> 00:22:20.669
Second part is equitable distribution the
examples I showed that how the facilities

00:22:20.669 --> 00:22:25.610
are distributed in such a way so that wherever
you were located wherever your plots or houses

00:22:25.610 --> 00:22:31.200
located you can come and you can away that
facilities even if it is the green areas or

00:22:31.200 --> 00:22:32.730
any common to you facilities.

00:22:32.730 --> 00:22:42.539
So physically physical distribution of these
facilities, then optimizing land and resource

00:22:42.539 --> 00:22:48.750
land is very important and very curial resource
we cannot waste land and just to minimize

00:22:48.750 --> 00:22:54.970
the waste of land and to maximize the utilization
of the land we are taking so many lectures

00:22:54.970 --> 00:22:59.810
to discuss that how we make the policy how
we make the reforms, how we make the planning

00:22:59.810 --> 00:23:03.950
in the city and the region then after the
planning we make the develop and control we

00:23:03.950 --> 00:23:09.300
make the land subdivision we make the plottly
out plan and finally we take each and every

00:23:09.300 --> 00:23:14.320
plot to develop a housing or develop any other
thing.

00:23:14.320 --> 00:23:20.669
So the objective is to optimize the land so
that we do not misuse the land so one element

00:23:20.669 --> 00:23:26.669
in this optimization is the amount of land
given for a particular plot for any facilities

00:23:26.669 --> 00:23:33.000
and second is these it is location like the
examples I was showing that the school location,

00:23:33.000 --> 00:23:39.500
the school plots can be given adjacent to
the playground so that the school building

00:23:39.500 --> 00:23:45.549
or the school authority can utilize that playground
simultaneously and this the playground or

00:23:45.549 --> 00:23:48.169
community as a hole also take the advantage
of the school.

00:23:48.169 --> 00:23:53.410
Those kind of integrative strategy could be
taken in the physical planning as well to

00:23:53.410 --> 00:23:58.169
optimize the land then the balance between
the present and demand and the supply, so

00:23:58.169 --> 00:24:03.200
present you might find that in the planning
of the overall city your demand could be very

00:24:03.200 --> 00:24:08.630
high buy your supply of the land and the investment
could be low, so how you can balance how we

00:24:08.630 --> 00:24:14.750
can maximize your benefit for the people that
is very important so your priority between

00:24:14.750 --> 00:24:21.590
the various services is important that definitely
the basic infrastructures like say water supply,

00:24:21.590 --> 00:24:27.600
electricity, access load, health and education
is not comprisable without that know housing

00:24:27.600 --> 00:24:29.450
develop can be done.

00:24:29.450 --> 00:24:36.280
Then flexibility for the future expansion
and modification the flexibility is very challenging

00:24:36.280 --> 00:24:42.870
term because the plan or design we make for
the people basically will may change due to

00:24:42.870 --> 00:24:51.760
it test of the people or the change of the
population pattern in the future we have seen

00:24:51.760 --> 00:24:56.789
in various core city of the area various lab
metropolitan city that because of the change

00:24:56.789 --> 00:25:02.500
of the population dynamics the populations
people are migrated to different cities, different

00:25:02.500 --> 00:25:07.150
changes the transformation has are going there
in happening.

00:25:07.150 --> 00:25:11.820
So because of this transformation of the population
dynamics there could be some kind of flexibility

00:25:11.820 --> 00:25:20.740
of the infrastructure and the facilities think
about the cities like Kolkata and Delhi where

00:25:20.740 --> 00:25:25.760
the it was done so many long years ago and
the infrastructure was designed only for few

00:25:25.760 --> 00:25:32.360
lacks of people but still now those infrastructures
are taking load of at least 5 to 6 times of

00:25:32.360 --> 00:25:36.539
population so that is the essence of the in
flexibility and the expansion possibility

00:25:36.539 --> 00:25:40.760
of the infrastructure and the facilitates.

00:25:40.760 --> 00:25:45.650
And the context for the commodity and the
end user, the infrastructure and the facilities

00:25:45.650 --> 00:25:52.730
we design should be contextual the road section
or the standards we I drive when I showed

00:25:52.730 --> 00:25:59.799
you in the last lectures is a standard section,
but you will find that in Indian roads, Indian

00:25:59.799 --> 00:26:06.000
common spaces and the terminals you will find
lot of informal elements informal shops, informal

00:26:06.000 --> 00:26:15.360
vending elements vending shops so how we can
accommodate integrate those in the common

00:26:15.360 --> 00:26:20.250
place because we cannot eliminate 100% we
need this after some extend.

00:26:20.250 --> 00:26:26.190
Recently government of India through their
street bending act they have given the authority

00:26:26.190 --> 00:26:32.289
for the street bending but in a specific demarcated
zone so that is the challenge for the planner

00:26:32.289 --> 00:26:37.980
that in a housing area at various level never
wood level, sector level, city level how we

00:26:37.980 --> 00:26:43.090
can place all those kind of informal facilities
which we require.

00:26:43.090 --> 00:26:46.400
One example I will show that we can place
those facility.

00:26:46.400 --> 00:26:51.130
So that you do not misuse the land at the
same time you use the land for the better

00:26:51.130 --> 00:26:55.460
benefit of the society so that is very important
that do you planning should be contextual

00:26:55.460 --> 00:27:00.450
for the community and the end user we cannot
make your road, town ship which is looking

00:27:00.450 --> 00:27:07.820
good but which is not servicing our country
man which may be servicing the any other country

00:27:07.820 --> 00:27:14.170
so based on the requirement of the other our
country man and the people we have to design.

00:27:14.170 --> 00:27:20.301
Now just now we talked about the informality
that the informal shops and the vendors you

00:27:20.301 --> 00:27:25.950
will see that most of the vendors and the
informality comes in the nodes in the intersection

00:27:25.950 --> 00:27:31.659
in our cities and the intersections are very
much venerable the basic reason for the venerability

00:27:31.659 --> 00:27:36.890
is that most of the activities loading, unloading
transfer from one vehicle to another vehicle

00:27:36.890 --> 00:27:45.350
takes goes on in the node area in the intersection,
because intersection is the area where the

00:27:45.350 --> 00:27:52.179
large buses come the metro rails ends there
terminates there and those intersections are

00:27:52.179 --> 00:27:56.840
not given priority not given much attention
in terms of the informality.

00:27:56.840 --> 00:28:03.929
So in this project we also consider that how
we can bring that element in the planning

00:28:03.929 --> 00:28:09.360
and keep some area for the community facilities
like this is a.

00:28:09.360 --> 00:28:15.240
Typical plan of a junction you can see that
the typical junction is consisting of a major

00:28:15.240 --> 00:28:23.580
road and the minor road usually but we kept
additional road both side of the four quadrant

00:28:23.580 --> 00:28:29.701
of the road junction and this junctions are
acting as a space for you can say see the

00:28:29.701 --> 00:28:35.450
convinced or a transport terminal to accommodated
the paratransits or the public conveniences

00:28:35.450 --> 00:28:42.600
to have some areas where some public function
some informal street gathering so informal

00:28:42.600 --> 00:28:47.669
activities could be there this kind of areas
could be act as it transform terminal and

00:28:47.669 --> 00:28:52.610
here there could be foot keys there could
be small shops and the equipoise elements.

00:28:52.610 --> 00:28:59.320
So these kind of element could be accommodated
not only that the pedestrian pathways can

00:28:59.320 --> 00:29:04.980
be integrated with the bus stop age and the
transport terminal and the community facilities

00:29:04.980 --> 00:29:10.311
given there and another part you can see that
the service road is connected in such a way

00:29:10.311 --> 00:29:16.020
so that it is not hampering the journey or
the movement of the major arterial road as

00:29:16.020 --> 00:29:21.550
well as it is giving the connection or the
access to the paratransit and the culture

00:29:21.550 --> 00:29:24.850
at the foot key as in the other quadrant.

00:29:24.850 --> 00:29:33.190
So this is the way how we can accommodate
the informal facilities and the amenities

00:29:33.190 --> 00:29:40.950
in the common areas like nodes and the junction
without wasting much, much area and without

00:29:40.950 --> 00:29:46.020
affecting the physical space because if we
do not provide this space ultimately eventually

00:29:46.020 --> 00:29:50.400
this kind of facilities will come here 20
numbers of auto rickshaws will stand there

00:29:50.400 --> 00:29:56.870
so we cannot bear that we cannot we no longer
can allow that so for that so to face in those

00:29:56.870 --> 00:30:02.580
kind of situation cabanas the conjunction
we have provided the areas and the four quadrant

00:30:02.580 --> 00:30:03.580
of the road.

00:30:03.580 --> 00:30:08.400
This is the current situation of that particular
junction you can see that some shops has already

00:30:08.400 --> 00:30:14.169
come here and this is the area for the best
bus lengths the bus will come and stop there

00:30:14.169 --> 00:30:19.250
they loading unloading can go there so that
the main carriage becomes free the service

00:30:19.250 --> 00:30:23.820
road will go from different site like this
and we will connect to other part this is

00:30:23.820 --> 00:30:29.730
the areas where kept for the quacks and the
foot and the paratransits so this can be very

00:30:29.730 --> 00:30:33.650
important planning excel side you should take
a very important learning notes from this

00:30:33.650 --> 00:30:35.120
cases.

00:30:35.120 --> 00:30:41.510
So having said that the next lecture will
discuss the housing strategy how we combine

00:30:41.510 --> 00:30:48.110
all these element in a strategic document
for a city the infrastructure the develop

00:30:48.110 --> 00:30:54.950
and control the land dues it is prescription
everything so before I finish the lecture

00:30:54.950 --> 00:30:59.710
let me quickly summarize what we discussed
today we discussed the social infrastructure

00:30:59.710 --> 00:31:05.600
or the amenities we discuss that social the
educational facility, health facility, community

00:31:05.600 --> 00:31:13.450
facilities at the different level like say
our building level to the block level to the

00:31:13.450 --> 00:31:16.530
cluster level to the neighborhood level and
the city level.

00:31:16.530 --> 00:31:20.520
And the basic challenge of this designing
and planning of the facilities is that the

00:31:20.520 --> 00:31:26.770
equitable distribution of the facility over
the space the second is the to maintain this

00:31:26.770 --> 00:31:33.220
standards prescribed by the codes or the norms
like you are deify because land is very scarce

00:31:33.220 --> 00:31:39.880
so how we can give the priority over the facilities
and which are the norm I mean and after giving

00:31:39.880 --> 00:31:44.409
the priority we can keep a balance we can
maintain a balance for all the facilities

00:31:44.409 --> 00:31:47.720
so that nobody is refight of any facility.

00:31:47.720 --> 00:31:52.559
The facility should be equitably distributed
over the area so that everybody irrespective

00:31:52.559 --> 00:31:58.309
of caste and gender and the economic status
they get the equal benefit and also the optimize

00:31:58.309 --> 00:32:03.289
utilization of the land because land is a
very commodity and the pricely commodity so

00:32:03.289 --> 00:32:09.059
optimum utilization of the land is very, very
important for the designing of this commodity

00:32:09.059 --> 00:32:10.059
facilities.

00:32:10.059 --> 00:32:15.960
After that we ended the discussion with the
essence of the informal facilities and amenities

00:32:15.960 --> 00:32:21.230
required at the housing development or at
the city level for the people in our country

00:32:21.230 --> 00:32:22.230
like India.

00:32:22.230 --> 00:32:27.990
So we can accommodate this kind of informal
requirement or the people in terms of paratransit

00:32:27.990 --> 00:32:32.850
facility in terms of these street bending
or the informal facilities in the junctions

00:32:32.850 --> 00:32:40.679
in the nodes or in the common areas meticulously
so that with very minimal areas of profession

00:32:40.679 --> 00:32:46.730
we can achieve maximum benefit so that in
future those areas do not get congested and

00:32:46.730 --> 00:32:52.440
do not get on sustainable and do not look
ugly so that is your objective of the overall

00:32:52.440 --> 00:32:55.400
discussion of the infrastructure and facility.

00:32:55.400 --> 00:33:02.870
So next day we will discuss the housing strategy
at the city level, this discussion will talk

00:33:02.870 --> 00:33:08.190
about that after the planning excel size the
element every element we talked that the develop

00:33:08.190 --> 00:33:14.180
and controls and the infrastructure element
how we can combine these to come out as a

00:33:14.180 --> 00:33:18.119
comprehensive strategy document for housing
in a city, so thank you for today.