Hello last day we discussed about the housing
strategy for the existing built-up area of

00:00:24.820 --> 00:00:28.419
a city and focusing more on the core city
of the housing.

00:00:28.419 --> 00:00:36.300
Today we will discuss a different part of
the city housing that is the housing for the

00:00:36.300 --> 00:00:41.460
new areas, how we can strategize new areas
for our desired objection.

00:00:41.460 --> 00:00:49.399
So before I, so as the part of the discussion
which we had last day we mentioned that for

00:00:49.399 --> 00:00:54.960
the old city or the core city housing or the
already built-up areas of the housing we use

00:00:54.960 --> 00:01:01.390
concept of re densification, de densification
and we use different kind of development controls.

00:01:01.390 --> 00:01:07.330
Including affair so we can use a variable
affairs and we can indensify the desired development

00:01:07.330 --> 00:01:13.600
by using different tools and techniques like
tax assumption like the differential affair

00:01:13.600 --> 00:01:19.350
like the exemption of the fees and the different
kind of insert charts, those kind of things

00:01:19.350 --> 00:01:25.630
are done and this re densification and de
densification basically depends on the holding

00:01:25.630 --> 00:01:33.240
capacity of the area of the city of the built-up
areas of the city in terms of their infrastructure.

00:01:33.240 --> 00:01:38.789
So more the infrastructure development possibility
or augmentation possibility more its holding

00:01:38.789 --> 00:01:43.460
capacity, more the density can be allowed.

00:01:43.460 --> 00:01:53.069
So based on the discussion we told that few
terms we mentioned like vinual and the conservation.

00:01:53.069 --> 00:01:59.050
So either we augment the infrastructure de
densify we go for more denser development

00:01:59.050 --> 00:02:07.050
and we knew the area with new infrastructure
or we can, in addition to that we can conserve

00:02:07.050 --> 00:02:12.470
some of the core city of the housing areas
which is basically depicting the tradition

00:02:12.470 --> 00:02:18.600
of the, our culture or the city or maybe it
has evolved through the ages with the city

00:02:18.600 --> 00:02:19.989
history.

00:02:19.989 --> 00:02:25.849
So those kind of study could be required for
the existing built-up areas of the city.

00:02:25.849 --> 00:02:34.370
Now we will go to the deflection of the next
part which is the next part is consisting

00:02:34.370 --> 00:02:35.859
the housing for the new areas.

00:02:35.859 --> 00:02:41.230
So new areas of the housing is different than
the housing in the core city area.

00:02:41.230 --> 00:02:46.590
So in the new areas of the housing the first
part which first element which comes in our

00:02:46.590 --> 00:02:49.239
mind is the assume land availability.

00:02:49.239 --> 00:02:55.530
In the housing strategy destruction we already
discussed that the land availability exercise

00:02:55.530 --> 00:02:57.040
is very, very important.

00:02:57.040 --> 00:03:02.560
Now after establishing the fact that which
are the land available and which are land

00:03:02.560 --> 00:03:07.860
not available, the next part is that how we
can assemble the land, now in the land assembly

00:03:07.860 --> 00:03:12.870
discussion we discussed that either we can
go for acquisition, we can acquire the land

00:03:12.870 --> 00:03:19.090
if required or we can go for private public
partnership where the private part they can

00:03:19.090 --> 00:03:25.670
purchase the land directly or we can, we do
not acquire or we do not go for private public

00:03:25.670 --> 00:03:31.120
partnership we just prescribe the desired
affair and the desired networks the people

00:03:31.120 --> 00:03:32.670
and the contours.

00:03:32.670 --> 00:03:37.560
And third could be that the land assembly
using different techniques of land readjustment

00:03:37.560 --> 00:03:42.400
where we take the land for some time, we develop
the land that means we provide the infrastructure

00:03:42.400 --> 00:03:45.390
and give back the land to the owner.

00:03:45.390 --> 00:03:50.560
So we take the raw land, we develop it, we
return back the developed land with the renewed

00:03:50.560 --> 00:03:56.840
infrastructure, those kind of land assembly
techniques could be excel site in any city.

00:03:56.840 --> 00:04:02.420
So after the land assembly we have the land
with our land some substantial land will be

00:04:02.420 --> 00:04:03.420
available.

00:04:03.420 --> 00:04:07.919
So the next part will be to decide that what
kind of housing is required.

00:04:07.919 --> 00:04:12.370
So based on the lands the strategy document
already we have done the strategy document,

00:04:12.370 --> 00:04:17.209
so it is clearly retained that which part
is going to be what, what kind of housing

00:04:17.209 --> 00:04:20.050
typology will come in which area.

00:04:20.050 --> 00:04:25.490
So based on that what kind of, whether it
is a group housing or plotted housing based

00:04:25.490 --> 00:04:28.080
on that what we do is the land subdivision.

00:04:28.080 --> 00:04:38.400
So land subdivision exercise is basically
excel size where we subdivide the land with

00:04:38.400 --> 00:04:42.530
the concept of the group housing and the plotted
housing.

00:04:42.530 --> 00:04:46.830
So there could be bigger land, there could
be smaller land parcel or the medium land

00:04:46.830 --> 00:04:55.380
parcel, but the land pockets or the size of
the land plots are very, very important.

00:04:55.380 --> 00:05:19.470
So in the city basically we have, these are
already built-up areas and we are talking

00:05:19.470 --> 00:05:24.260
about the areas beyond this which is basically
going to be the new housing areas and as far

00:05:24.260 --> 00:05:33.199
the housing strategy we measure then pockets
are already identified as different pockets

00:05:33.199 --> 00:05:39.430
for example, these are going to be say cooperative
housing, these are going to be okay or rental

00:05:39.430 --> 00:05:48.639
housing or execution of housing or simply
group housing or plotted housing.

00:05:48.639 --> 00:05:54.010
So after identification of those, all those
pockets we have to take the decision that

00:05:54.010 --> 00:05:56.120
how we can subdivide the land.

00:05:56.120 --> 00:06:02.800
So subdivision of the land, so this is very,
very big chunks of the land we have to go

00:06:02.800 --> 00:06:10.979
beyond, we have to go further details so that
we can develop the land parcel in a better

00:06:10.979 --> 00:06:21.310
way to develop the land like this so we can
go even further detailing with smaller parcel

00:06:21.310 --> 00:06:26.919
of the land so that each and every parcel
of the land can be given to some developer

00:06:26.919 --> 00:06:31.080
can take it as a plot and develop a housing
project.

00:06:31.080 --> 00:06:35.530
So this land subdivision exercise is very
important at this stage so land sun division

00:06:35.530 --> 00:06:40.581
exercise is basically the scientific method
by which we subdivide a bigger chunk of the

00:06:40.581 --> 00:06:44.110
land into smaller pieces of plots and the
plots for the further development.

00:06:44.110 --> 00:06:51.910
The after that we can use the contemporary
concept like the transit oriented development

00:06:51.910 --> 00:06:56.979
the compact cities smart city non motorized
transportation all the concept why we make

00:06:56.979 --> 00:07:05.229
the land subdivision like some of the pockets
could be having some different concept so

00:07:05.229 --> 00:07:10.000
maintaining the overall theory overall concept
and the vision of the city development plan

00:07:10.000 --> 00:07:15.410
and housing strategy those kind of if any
concepts are prevailing there we could integrate

00:07:15.410 --> 00:07:18.800
those kind of concept at the land subdivision
also.

00:07:18.800 --> 00:07:24.090
The we do the investment and the development
strategy what kind of instrument and development

00:07:24.090 --> 00:07:30.099
require for each parcel of the land institutional
housing group housing plotted housing or cooperative

00:07:30.099 --> 00:07:36.240
housing or rental housing what kind of housing
will come and then definitely how we dispose

00:07:36.240 --> 00:07:43.129
them dispose the land parcel to the market
one approach of the disposal of the land is

00:07:43.129 --> 00:07:48.810
that you dispose them through a conman transparent
loitering process where you just advertise.

00:07:48.810 --> 00:07:53.969
The availability of the land to the common
people or the private developer and dispose

00:07:53.969 --> 00:07:59.680
them another approach could be another approach
could be that you just bit the you jest open

00:07:59.680 --> 00:08:06.090
for just call a open tender or building for
the land and whoever is the highest builder

00:08:06.090 --> 00:08:11.249
that you allot that land to the highest builder
so usually the bigger land or the commercial

00:08:11.249 --> 00:08:16.830
land or the where major investment is possible
and the private developers land those are

00:08:16.830 --> 00:08:22.539
given for the building and the open tendering
process otherwise a small parcel which is

00:08:22.539 --> 00:08:24.129
basically for the small plots.

00:08:24.129 --> 00:08:29.870
And the plotted housing those are given through
the open lottery system transparent advertisement

00:08:29.870 --> 00:08:36.190
to the common people and based on the application
based on the response a lottery is conducted

00:08:36.190 --> 00:08:43.060
and on that bases the land is disposed and
not only that with the disposal mechanism

00:08:43.060 --> 00:08:47.370
another very important part is the pricing
mechanism so after the land subdivision you

00:08:47.370 --> 00:08:53.730
have various kinds of plots size of plots
sub land for each economy group for example

00:08:53.730 --> 00:08:58.700
there could be transfer higher income group
middle group middle income group and low income

00:08:58.700 --> 00:08:59.700
group.

00:08:59.700 --> 00:09:04.380
So what kind of pricing mechanism will be
there will it be the uniform land prizing

00:09:04.380 --> 00:09:11.410
or there will be some differential land prizing
for HIG MIG and LIG so those kind of concept

00:09:11.410 --> 00:09:17.920
need to be taken care of at the land deposal
mechanism usually some kind of cause sub city

00:09:17.920 --> 00:09:24.720
could be taken out so that some additional
amount of raising could there for the HIG

00:09:24.720 --> 00:09:29.589
and that could be leverage to the lower income
group and economical weaker section for any

00:09:29.589 --> 00:09:36.480
plot for group housing project the group housing
could be given to the developer with the meditate

00:09:36.480 --> 00:09:42.010
of the percentage of the economic group as
a meditate to develop the mixed housing mixed

00:09:42.010 --> 00:09:43.010
group.

00:09:43.010 --> 00:09:47.560
So those kind of motilities is important at
the land disposer mechanism and not only at

00:09:47.560 --> 00:09:53.050
the end it should be consider at the beginning
when we do the land subdivision there where

00:09:53.050 --> 00:09:58.421
land subdivision this part I will discuss
in greater detail so land subdivision at the

00:09:58.421 --> 00:10:04.600
level time of subdivision you have the everything
in your mind that how the land will be disposed

00:10:04.600 --> 00:10:10.980
and then how we will check the balance of
the overall development so this is the fundamental

00:10:10.980 --> 00:10:16.650
stages of the housing development for the
new areas after that we need to discus few

00:10:16.650 --> 00:10:18.750
element of the land subdivision.

00:10:18.750 --> 00:10:25.089
That how we actually divide the land bigger
parcel of the land into small pieces of land

00:10:25.089 --> 00:10:33.010
so let the small pieces of land are utilized
by the developer or the small developer the

00:10:33.010 --> 00:10:38.120
first principle of the land subdivision is
the levels of planning now we have told you

00:10:38.120 --> 00:10:42.829
that after the land the housing strategy we
have air mark all the bigger land chucks have

00:10:42.829 --> 00:10:49.930
cooperative housing as rental housing as institutional
housing or group plotted housing now this

00:10:49.930 --> 00:10:54.300
is a very big area as a per the master plan
and the housing strategy.

00:10:54.300 --> 00:11:04.360
The total population and density will be return
for example this land chunk could be there

00:11:04.360 --> 00:11:21.250
for 300 hector then density could be 
say 800 per hector and as per the housing

00:11:21.250 --> 00:11:28.450
strategy you have made it is also mentioned
that this 800 hector 800 / hector of in a

00:11:28.450 --> 00:11:42.889
total area of 300 will be consisting of HIG
MIG LIG and either ways in the proposition

00:11:42.889 --> 00:11:56.209
of 50% 30% and 20% so this is given to you
as a in the housing strategy exercise.

00:11:56.209 --> 00:12:02.290
So how do you allocate the land here the bigger
land here so that ultimately we can achieve

00:12:02.290 --> 00:12:07.949
this proportion we can achieve the overall
density of this particular gross area and

00:12:07.949 --> 00:12:14.360
within the limited area given to us so that
is very important in this stage so one very

00:12:14.360 --> 00:12:21.730
important concept in the whole land sub division
is the levels of planning, so there are various

00:12:21.730 --> 00:12:33.270
levels of planning which will dictate or which
will determine this size of the plot or the

00:12:33.270 --> 00:12:41.080
shape of the plot so one of the major very
important is the how we defined neighborhood.

00:12:41.080 --> 00:13:02.750
So neighborhoods is the unit of the housing
development basically 

00:13:02.750 --> 00:13:11.980
so by and large one never who is determine
by a community or a settlement who shares

00:13:11.980 --> 00:13:17.279
common facility in India the traditional cities
you have seen in the traditional cities that

00:13:17.279 --> 00:13:25.019
the elements the names like Machala or the
names like Para or Machala or different names

00:13:25.019 --> 00:13:29.640
or local names are there which is nothing
but the neighborhood in our Indian cities.

00:13:29.640 --> 00:13:35.560
So Indian cities are having the unit of various
units so it may be having different population

00:13:35.560 --> 00:13:42.380
for example one neighborhood could have a
4000populzatiion or 5000 or even more like

00:13:42.380 --> 00:13:59.850
25000 so basically it is determine by the
sharing common facility at the, now even the

00:13:59.850 --> 00:14:04.920
sharing the common facility in terms of like
the schools or health facility or community

00:14:04.920 --> 00:14:06.920
center it can be at the various level.

00:14:06.920 --> 00:14:13.510
I told you an example that in a housing cluster
if there are a housing cluster of the building

00:14:13.510 --> 00:14:20.519
cluster there could and internal coterie which
can be utilize as communities or community

00:14:20.519 --> 00:14:27.250
function or community area so this is this
cannot be called as a neighborhood so we call

00:14:27.250 --> 00:14:35.680
this kind of arrangement as a cluster so cluster
is basically a combination of various blocks

00:14:35.680 --> 00:14:42.000
and the buildings with some common facilities
by and large it is common facilities it can

00:14:42.000 --> 00:14:51.190
small play area it can be coated so this is
one cluster it can be the cluster of ten house

00:14:51.190 --> 00:14:57.940
or cluster of 15 house or 20- house the population
could be 1000 even less.

00:14:57.940 --> 00:15:03.120
So more or less this kind of population can
be canted by a new cluster so one cluster

00:15:03.120 --> 00:15:08.029
basically gives you a mended to have one at
least one community place where the children

00:15:08.029 --> 00:15:17.070
can play, so this kind of cluster can form
multiple number of cluster can form one neighborhood

00:15:17.070 --> 00:15:30.459
so basically neighborhood is equivalent to
so multiple clusters, so multiple clusters

00:15:30.459 --> 00:15:38.060
make a neighborhood so neighborhood is nothing
nut a population of 4000 to it can be even

00:15:38.060 --> 00:15:40.480
bigger like 25000.

00:15:40.480 --> 00:15:46.279
So neighborhood basically enjoys a common
playground of the older children and some

00:15:46.279 --> 00:15:51.660
other facilities like a primary school or
commercial facility so first in these levels

00:15:51.660 --> 00:15:57.529
of planning the immediate.

00:15:57.529 --> 00:16:05.730
Your first element in this planning is your
own 

00:16:05.730 --> 00:16:15.100
house it can be plotted or it can be group
housing also then is your cluster, so cluster

00:16:15.100 --> 00:16:34.230
is defined by a common facility around a tot
lot or play area, population ranging from

00:16:34.230 --> 00:16:38.579
1000 and then we have the neighborhood.

00:16:38.579 --> 00:16:47.399
So for the neighborhood we can have the population
of anything between 5000 to 25000 and then

00:16:47.399 --> 00:16:57.980
we have the sectors which are bigger than
the neighborhood it can be have population

00:16:57.980 --> 00:17:06.589
of 25000 to 50000 so one cluster is defined
by using a common plot lard or the community

00:17:06.589 --> 00:17:15.130
area whereas one neighborhood is defined by
using one playground for the older children

00:17:15.130 --> 00:17:26.339
then you have primary school one primary school
and commercial area.

00:17:26.339 --> 00:17:41.870
Whereas one sector will be determine by its
higher secondary school 

00:17:41.870 --> 00:17:48.290
higher level of green park and few more facilities
like say health facilities and commercial

00:17:48.290 --> 00:17:59.970
facilities so from the smaller so from small
to so higher level of facility we design for

00:17:59.970 --> 00:18:08.290
the land subdivision now in a typical neighborhood
typical area if you want to develop like say

00:18:08.290 --> 00:18:16.059
sectors say sectors having 25000 so if your
density is 800 so accordingly you can calculate

00:18:16.059 --> 00:18:22.540
the land area for sector and you can distribute
this sectors over the area suitably using

00:18:22.540 --> 00:18:26.350
your area.

00:18:26.350 --> 00:18:32.260
Now this is a method where you have to have
the special planning and design attitude by

00:18:32.260 --> 00:18:38.030
which you can make for mutation combination
and few more exercise and you can connect

00:18:38.030 --> 00:18:46.530
the whole area with no network now making
that road internal road network of this collector

00:18:46.530 --> 00:18:51.559
road and local road is essential we have discussed
about this road network and the road and transportation

00:18:51.559 --> 00:18:55.520
when you discuss the info structure for the
housing development.

00:18:55.520 --> 00:19:01.220
So those discussion can be called and the
collector road having the width of 18 meter

00:19:01.220 --> 00:19:07.730
to the 20 or 24 meter and the local road though
it is of 10 meter to 12 meter, can be utilized

00:19:07.730 --> 00:19:11.450
to differentiate or to define the two side
by side plot.

00:19:11.450 --> 00:19:16.730
And these can be given like one sector and
another sector like that, like that and each

00:19:16.730 --> 00:19:21.750
sector can be developed separately by individual
development or developer agency.

00:19:21.750 --> 00:19:27.789
So this is how we do the land sub division
whereas we go for the spate housing the land

00:19:27.789 --> 00:19:33.270
sub division will become much more complicated
much more signify, because here may be the

00:19:33.270 --> 00:19:38.160
number of plots are may be very few because
plots are very big in terms of the size and

00:19:38.160 --> 00:19:40.030
the shape because it is a group of plot.

00:19:40.030 --> 00:19:51.760
But here if the plotted housing is done the
land sub division will be much more, we have

00:19:51.760 --> 00:19:57.550
to develop sector by dividing it into various
neighborhood.

00:19:57.550 --> 00:20:07.190
With some common facility and each neighborhood
will be having several local road and small

00:20:07.190 --> 00:20:12.110
plots I will show some examples, so that you
can understand in a better way so that is,

00:20:12.110 --> 00:20:16.330
this is since of defining any bigger plot
into smaller plot.

00:20:16.330 --> 00:20:22.580
So based on the typology which is given or
dictated in the development plan or the housing

00:20:22.580 --> 00:20:27.030
strategy we make the land sub division activity,
according to group housing or the plotted

00:20:27.030 --> 00:20:28.059
housing or another housing.

00:20:28.059 --> 00:20:34.700
The second part is of the land sub division
is the access road.

00:20:34.700 --> 00:20:41.440
We told about the access road so access road
for the, bigger plots will be wider and the

00:20:41.440 --> 00:20:47.299
smaller plots will be, will be lesser bigger
plot wider road, smaller plot narrow road.

00:20:47.299 --> 00:20:53.279
That is the fundamental approach we do we
should take for land sub division using the

00:20:53.279 --> 00:20:55.230
different kinds of road.

00:20:55.230 --> 00:21:01.480
The third part is intended development whether
it is a group housing or plotted housing for

00:21:01.480 --> 00:21:04.110
rental housing or property housing.

00:21:04.110 --> 00:21:08.990
The requirement of the property housing is
different than the group housing, because

00:21:08.990 --> 00:21:11.510
the size of the cooperative house may be different.

00:21:11.510 --> 00:21:15.610
So we will have a different discussion on
the cooperative housing but for today you

00:21:15.610 --> 00:21:20.800
can take a note that for cooperative housing
we have to design the product.

00:21:20.800 --> 00:21:26.059
We have to design and design the product in
such a way that each and every corner or cooperative

00:21:26.059 --> 00:21:31.130
can stay there can build the house in the
plot size and the shape.

00:21:31.130 --> 00:21:37.049
So to determine the plot size and shape have
to have a cross calculation, cross calculation

00:21:37.049 --> 00:21:40.919
of the possible architectural layout of the
housing.

00:21:40.919 --> 00:21:44.110
For that particular in serve group or particular
number of these group.

00:21:44.110 --> 00:21:49.200
For example in a cooperative housing we have
say 10 members cooperative member however

00:21:49.200 --> 00:21:50.200
cooperative.

00:21:50.200 --> 00:21:53.720
So for that particular group we say MIG may
be the income group you have to calculate

00:21:53.720 --> 00:21:59.140
the how much area will be required for a MIG
group for 20 numbers or 10 numbers.

00:21:59.140 --> 00:22:04.770
So based on that you have to have a calculation
of the architectural exercise and then you

00:22:04.770 --> 00:22:06.390
can determine the plot size.

00:22:06.390 --> 00:22:12.659
So that the why we are taking all this trouble
to make the to strengthen the size and shape

00:22:12.659 --> 00:22:13.659
of the plot.

00:22:13.659 --> 00:22:19.740
In a plot sub division exercise because we
are trying to optimize the usage of the land

00:22:19.740 --> 00:22:24.580
we cannot waste the land any more that is
why we are taking almost care in each and

00:22:24.580 --> 00:22:29.419
every stages of land sub divisions so that
we can stop the wastage of the land at any

00:22:29.419 --> 00:22:34.850
stage.

00:22:34.850 --> 00:22:41.730
Then we have the size and shape of the plot
usually the size and shape of the plots are

00:22:41.730 --> 00:22:48.900
considered as like rectangle, like this,

00:22:48.900 --> 00:23:00.870
So where the access node is even at the narrow
side so this is the narrow side and this is

00:23:00.870 --> 00:23:16.590
the wider side so if you depict this as X
and Y. so X should be more than or equal to

00:23:16.590 --> 00:23:22.980
1.5, Y so why we are doing this because we
are doing this to optimize the usage of the

00:23:22.980 --> 00:23:33.931
land so that is we do the reverse one that
means to provide the plot like this number

00:23:33.931 --> 00:23:40.480
1 we have the bigger is to the plot more number
of roads will be required to more amount of

00:23:40.480 --> 00:23:42.429
investment will be required.

00:23:42.429 --> 00:23:49.090
And secondly when we make the building the
back open space or the rear open space or

00:23:49.090 --> 00:23:52.220
the set back is bigger than the side open
space.

00:23:52.220 --> 00:23:58.070
Usually so here if you make a building the
back open space will be much of the space

00:23:58.070 --> 00:24:00.640
will be wasted.

00:24:00.640 --> 00:24:05.960
So that is why this is the optimal situation
where we are reducing the road frontage and

00:24:05.960 --> 00:24:11.520
the, the back open space where we are keeping
the back open space for the ferriage and sanitation

00:24:11.520 --> 00:24:12.520
part.

00:24:12.520 --> 00:24:19.299
And for the layout no the fairness pipe lines
and also for the ventilation, but in the case

00:24:19.299 --> 00:24:26.039
of the corner plots like in corner plots definitely
could be to loads having the corners like

00:24:26.039 --> 00:24:27.039
this.

00:24:27.039 --> 00:24:35.419
So these kinds of mechanism we do were the
plot configuration side shape is considered.

00:24:35.419 --> 00:24:39.779
And for the size as in told you earlier that
and the size depends on the how much people

00:24:39.779 --> 00:24:45.919
and how much unit to be accommodated in the
in the particular plot.

00:24:45.919 --> 00:24:53.091
We can maintain the common fair of a every
plot so that after construction of the free

00:24:53.091 --> 00:24:54.091
plot.

00:24:54.091 --> 00:24:58.279
They can assume maximum fare of the plot and
they can assume fare so it can slum all the

00:24:58.279 --> 00:25:00.770
people are required to be accommodated.

00:25:00.770 --> 00:25:05.450
If it is 10 member cooperative or it is 20
member property for 40 members property.

00:25:05.450 --> 00:25:11.919
The land size is very accordingly and proportional
that is the essence of the land sub division.

00:25:11.919 --> 00:25:16.360
Then next point is the build form your urban
design then hoe we are considering the build

00:25:16.360 --> 00:25:22.080
form the whole area from picture you will
understand the design and the building form

00:25:22.080 --> 00:25:24.330
and the distribution of the facility.

00:25:24.330 --> 00:25:29.950
The facilities also can be distributed in
the level of value we told the house level

00:25:29.950 --> 00:25:36.039
some facility are given the cluster level
some few level facilities given at the level

00:25:36.039 --> 00:25:40.760
few other facilities are given and at the
center level some bigger levels are given.

00:25:40.760 --> 00:25:46.029
So facilities are given at varies levels and
these levels are planning are determined defined

00:25:46.029 --> 00:25:52.149
with the facility now with the discussion
let us see from the example that how it looks

00:25:52.149 --> 00:25:56.380
like in this example you can see that four
levels are there.

00:25:56.380 --> 00:26:02.081
These are four neighbor hoods having common
facility here and we can see the plot how

00:26:02.081 --> 00:26:09.049
the intricate of the plots are done let us
take the second example.

00:26:09.049 --> 00:26:16.220
Here also you can see this is the major roads
going there and these are the internal routes

00:26:16.220 --> 00:26:23.649
and you can see that bigger lands the grouping
lands are here these are the group housing

00:26:23.649 --> 00:26:31.750
lands, so group lands are bigger, so bigger
land placed in the side of the bigger routes

00:26:31.750 --> 00:26:36.120
so that they can get the maximum advantage
are at the smaller land, smaller plots these

00:26:36.120 --> 00:26:43.220
are the smaller inside at the junction ate
the side of the smaller local routes you can

00:26:43.220 --> 00:26:50.740
find that further smaller plots at there not
only that this is now you can see these are

00:26:50.740 --> 00:26:52.130
the plots having.

00:26:52.130 --> 00:26:58.399
the commodity facilities these are the facilities
having the sector level and this the facility

00:26:58.399 --> 00:27:08.390
at the neighborhood level there we can find
1, 2,3 4,5,6,7,and 8 is one very small neighborhood

00:27:08.390 --> 00:27:12.730
so eight neighborhood so eight neighborhood
consisting two different sector so in these

00:27:12.730 --> 00:27:17.890
sector they are enjoying this common facility
you can see the open space and the school

00:27:17.890 --> 00:27:21.399
and all those plot and this particular sector.

00:27:21.399 --> 00:27:27.370
They are enjoying some common facilities in
this side at here also some common facilities

00:27:27.370 --> 00:27:32.360
are given and apart from the common facility
at the sector every neighborhood enjoying

00:27:32.360 --> 00:27:39.950
their own open space some cases they are having
the water bodies and the primary school and

00:27:39.950 --> 00:27:45.090
some of the commercial areas therefore you
can understand that how the facilities and

00:27:45.090 --> 00:27:49.630
the plotting can be done at every level.

00:27:49.630 --> 00:27:54.990
Here also you can see the higher key of the
different levels of the planning similarly

00:27:54.990 --> 00:27:56.059
how we can see

00:27:56.059 --> 00:28:00.850
Now here you can see that these are the bigger
plots given for the higher buildings and this

00:28:00.850 --> 00:28:07.350
is the smaller plots given for the low-rise
building so concept is that we can go for

00:28:07.350 --> 00:28:16.100
this we discuss last day also concept is that
in the preferri we are having higher building

00:28:16.100 --> 00:28:23.059
and inside we can have low inside building
so that we can have maximum light indentation

00:28:23.059 --> 00:28:29.080
and we will passing and also visual pedestrian
and visual accessibility considering this

00:28:29.080 --> 00:28:34.140
kind of urban design concept also can be applied
for that bigger plots can be hope.

00:28:34.140 --> 00:28:39.929
In the preferri and smaller plots can be put
in center so that is cytology or the approach

00:28:39.929 --> 00:28:47.769
we can adopt this is another plotted development
again you can see the similar the larger plots

00:28:47.769 --> 00:28:52.520
are given for the group these are the larger
plots these are also larger plots some of

00:28:52.520 --> 00:28:57.600
the plots are given for commercial areas and
you can see various individual plots having

00:28:57.600 --> 00:29:01.650
connective green areas so this alignment of
the green area.

00:29:01.650 --> 00:29:06.210
Further it is the isolated green like we showed
in all the pictures all is connected green

00:29:06.210 --> 00:29:11.140
it depends on the concept of the whole development
or the individual of whole development so

00:29:11.140 --> 00:29:16.909
that what type of urban design concept is
considered but apart from that you can find

00:29:16.909 --> 00:29:21.100
out this is the one neighborhood this is another
neighborhood and this is another neighborhood

00:29:21.100 --> 00:29:26.700
have been enjoying their common green areas
and facility that is moral same for is type

00:29:26.700 --> 00:29:33.360
of plotted development but definitely you
can find different kind of higher routes.

00:29:33.360 --> 00:29:40.049
This is a wider road and this is a narrow
road and higher facilities this is the common

00:29:40.049 --> 00:29:43.940
facilities and the sector level these are
the facility are the neighborhood level and

00:29:43.940 --> 00:29:50.260
green areas higher of the green areas you
can see the major green areas at the sector

00:29:50.260 --> 00:29:57.120
level and the sub green areas at the neighborhood
level and smaller patches of the green at

00:29:57.120 --> 00:30:05.159
every cluster so this is a cluster, this is
a cluster this green area can be utilize by

00:30:05.159 --> 00:30:10.110
this many plots this type of green areas can
be utilize by this many plots so though each

00:30:10.110 --> 00:30:15.809
and every cluster cannot be differentiated
clearly but you will find a variety and higher

00:30:15.809 --> 00:30:20.980
key of open space road and all the facilities
very clearly in this.

00:30:20.980 --> 00:30:29.220
Layout that defines the plots sub-division
mechanism of a new areas so next day we will

00:30:29.220 --> 00:30:34.600
discuss few more elements of the housing strategy
so today we next the housing strategy for

00:30:34.600 --> 00:30:39.820
the new area we told that the housing strategy
for the new area are completely different

00:30:39.820 --> 00:30:44.390
with why the housing strategy with the existing
build-up area in the existing build-up area

00:30:44.390 --> 00:30:50.320
we basically obtain the infrastructure and
we residency or residency the infrastructure

00:30:50.320 --> 00:30:56.100
wireless in the new areas we each and every
pocket of the housing development based on

00:30:56.100 --> 00:31:01.500
the housing typology and the housing strategy
like property housing group housing rental

00:31:01.500 --> 00:31:07.549
housing institutional housing and based on
that we decide on the type of the development

00:31:07.549 --> 00:31:14.710
the side of the plot module of the plot and
we sun divide the plot as per the levels pf

00:31:14.710 --> 00:31:20.200
planning and the levels of planning is defined
as per the amount facilities shared at different

00:31:20.200 --> 00:31:21.200
level.

00:31:21.200 --> 00:31:25.310
Like at the house level on building level
cluster level neighborhood level and sector

00:31:25.310 --> 00:31:32.769
level so based on that we can design the building
the housing pockets like in group housing

00:31:32.769 --> 00:31:38.580
or plotted housing and also we have seen few
examples to understand to an appreciate that

00:31:38.580 --> 00:31:46.029
how and the lands of the division various
had are maintain for the load for the open

00:31:46.029 --> 00:31:51.510
space we create open space and for the community
facilities as at different level having said

00:31:51.510 --> 00:31:58.840
that next we will cover few other specialized
area in terms or some cases for the housing

00:31:58.840 --> 00:32:06.110
strategy so today we are we have completed
the strategy for the new areas and the core

00:32:06.110 --> 00:32:09.580
areas so for today thank you for attending
this lecture.